Cold Room Installation | Cineplex Redbank Plaza

Yesterday we completed the installation of a dual temperature cold room at Cineplex Redbank Plaza. This job was completed for our client Hot Concepts Design & Construct, which was the third project we have worked with them on.

Our team did well on this job, as it flowed easily from start to finish. Access to the site was good, which came in handy when a crane was required to lift the refrigeration equipment onto the roof.

Find below a few photos of the cold room and freezer joint room during the construction period: